An ongoing look at the people, places and machines of the worlds most demanding open road race.
Monday, July 30, 2007
Getting ready to shift gears
Today I picked up the transmission from my trans builder and it's all ready to go. After tearing it down he asked me why I rebuilt it since everything inside of it looked perfect. I told him you can never be to careful, after all it had been sitting around for a long time and besides I wanted to change the input shaft to the design that best suited my racing needs.
After talking to my engine builder today I am hopeful that we may be testing it on the dyno this Thursday. (fingers crossed) Once I start installing the engine and transmission things should start to happen quickly.
Subscribe to:
Post Comments (Atom)
1 comment:
enjoyed browsing your blog,very interesting,especially the bit about racing stripes.
great images too!
Post a Comment